Case Studies
ISG Totty (Construction)
INTRODUCTION ISG Totty Construction – based in Bradford, England – is a heavy user of lighting and Information Technology equipment. The company identified the cost of electricity as a major concern and set out a project scope with Powerstar to find out if voltage optimisation could provide energy savings, but without compromising output.
THE CUSTOMER ISG Totty is a main contractor that works across a comprehensive range of industry sectors through its public and private divisions. The business is one of the largest construction and property development groups in the North of England, carrying out new and refurbishment projects up to £10 million in value.
In ISG’s sustainability policy, the business aims to progressively increase resource efficiency, to reduce dependence on non renewable resources and to reduce their carbon footprint.
THE CHALLENGE The primary source of power at the ISG Totty building is for lighting and IT equipment, with the incoming power being supplied through a 100A per phase (three phase supply). Initially the voltage coming into the site was recorded, showing at 247V, with a minimum of 244V.
THE SOLUTION The Powerstar voltage optimisation system effectively reduces the incoming voltage into a building to more accurately meet the needs of equipment and machinery which is designed to operate at a lower voltage than that supplied. Stopping the excess voltage enables an organisation to reduce consumption and as a result lower electricity bills and CO2 emissions.
THE BUSINESS BENEFITS Following installation, Powerstar achieved the following results:
The total amount saved by the business (based on 7p/kWh) is £5,938 and when the savings from the reduced Climate Change Levy (CCL) are added to the direct savings the total exceeds £6300, representing a 19.4% reduction in the total electricity consumption. QUOTATION FROM CUSTOMER “The Installation of the Powerstar systems has cut our energy cost by nearly 18%. This is a fundamental step towards our efforts to minimise our Carbon Footprint."
Phil Mason Facilities Manager, ISG Totty |